Section - Page:
11
Section:
3
Region:
R4: Intermountain
National Forest:
Caribou (2003)
Alternative:
Plan Direction:
Drastically disturbed sites are reclaimed so that natural recovery to pre-disturbed conditions is most likely. Reclamation emphasizes: 1) suitable topsoil preservation; 2) use of native plant species; and 3) stabilizing lands to a topographic relief (landform) that conforms to natural surroundings.
Type:
Desired Condition
Page:
Doc ID:
Table:
Plan Images (e.g., maps, tables, etc.):
Amendment Date:

Keywords
Extent:
Forest-wide
Applicable Activity:
Resource Protected:
Setting:
Category: